激情黄色国产免费_日韩骚妇午夜精品一区二区_激情网在线视频9_日韩午夜一区二区福利影院_伊人导航福利大全_a性av二三区色爽免费观看_国语亚洲国产精品日韩高清秒播_免费中文字幕精品有码视频_欧美三级日本在线观看成人_欧州一级 片内射av

\

Project Introduction 
?

Chengdu–Chongqing Intercity Railway (also known as Chengdu-Chongqing High-speed) is started from Chengdu East Station on the west, which passes through Jianyang South Station, Ziyang North Station, Zizhong North Station, Neijiang North Station and Longchang North Station eastwards, and enters into the territory of Chongqing. It also passes through Rongchang North Station, Dazu, Yongchuan East Station, Bishan and Shapingba, and arrives in Caiyuanba. The whole length is divided into 12 stations. Total estimated investment is 39.89 billion Yuan in the project, wherein static investment is 35.85 billion Yuan. Total construction duration is 4 years. The whole line length is 308km, which is shortened by nearly 200km compared with old Chengdu–Chongqing Line as long as 505km. The length of bridge and tunnel accounts for 66% of the whole length. Double-line ballastless track is adopted in the whole line.

 

Applied products

TK-GY cable grouting agent; TK-PC high-efficiency water reducer
 

 Case Show


\

Main railway track

\
Main track


\
Bridge in Jianyang Section

\
Chengdu–Chongqing Intercity Railway-Neijiang Construction Site
 

 


 
Chengdu–Chongqing Intercity No. 1 Railway